OUR PROJECTS

NO JOB IS TOO LARGE OR TOO SMALL

LOADER BUCKET

JOB DETAILS

  • Hired by GVEA to fabricate and weld a spill guard for a 980M loader to be used at their Healy coal plant.
  • It took approximately 24-hours to fabricate, weld, and paint.
  • Cost for material/labor was approximately $7,000.
  • Lincoln LN-25 and Hyper-Therm power max 85 plasma cutter were the primary pieces of equipment used for this project.

DUMP TRUCK TRAILER HITCH

JOB DETAILS

  • Fabricate and welded a hitch plate and safety chain D-rings to an end dump for a local excavation company.
  • Project took approximately 10 hours.
  • Cost for material and labor was approximately $1400.
  • Lincoln LN-25 and Hyper-Therm power max 85 plasma cutter were the primary pieces of equipment used for this project.

REBAR INSTALLATION FOR CONCRETE PAD

JOB DETAILS

  • Prepped area with #4 rebar for a concrete pad.
  • Cost for material and labor was approximately $2,000.

CUSTOM FUEL TANK

JOB DETAILS

  • 50 gal transfer tank welded inside and out with 1/8 thick steel.
  • Two baffles, drain plug, lifting eyes, and pressure tested.
  • Approximately 8 hours to complete the job.
  • $300 in materials. Total cost $800-$1000.